| Virual Oral Presentation Slide by Slide |
IEEE/ICACT20260382 Slide.03
[Big Slide]
| Oral Presentation |
|
|
Determining whether a control flow path is feasible is a critical challenge in program analysis, and it serves several purposes. First, it is essential for reducing false positives provided by static analysers. Second, it can be used to verify that there is no feasible path leading to problematic program points. Finally, it enables dead path elimination. | |
| [Go to Next Slide] |