IEEE/ICACT20230058 Slide.08        [Big Slide]       [YouTube] Oral Presentation
This study suggests three ways that things might work. The first is central control, which means that all equipment is verified by the central control station and data is sent through it, as shown in the figure below. This method avoids double validation, which is a plus, but it also needs a central control device and increases latency because the data has to be sent more than once.

[Go to Next Slide]
Select Voice: