IEEE/ICACT20240482 Slide.14        [Big Slide]       Oral Presentation
For the instrumental drift control, regular calibration and quality control with standard film are essential. So, the standard uncertainty of drift can be calculated using the standard uncertainty of standard film and quality control limit data.

[Go to Next Slide]
Select Voice: