IEEE/ICACT20260257 Slide.15        [Big Slide]       [YouTube] Oral Presentation
For validation, we designed three experimental scenarios. Scenario 1 tests normal operation where Slice 2 traffic flows via the primary path. Scenario 2 demonstrates fault detection and reconfiguration when OVS2 fails and the backup path is activated. Scenario 3 shows path restoration when OVS2 recovers and the original path is restored. Our validation method uses three approaches: First, Slice Manager terminal logs to capture fault detection and path change events. Second, Wireshark packet capture for traffic migration verification. And third, VLAN segmentation analysis to ensure slice isolation is maintained throughout the process.

[Go to Next Slide]
Select Voice: