Dear Author, you have a very good research. Is there an existing technology almost similar to your proposal that has been deployed in real world environment? What does it lack that your work specifically addressed? Thank you and stay safe.
First, due to the various disassembly line route or path, different products or sequential steps would be given. To find the minimized cost including workload, time, total amount of operators, etc., would be needed. However, in the past, most algorithm including genetic algorithms would individually consider each factor. The evaluated result would not be the optimal solution with additional computing time. This research would take multiple factors into consideration at the same time and evaluate all the factors instead of each factor in independent computing steps. Yes, recently, some recycle issues would be related to disassembly line such as mobile phone or 3C devices recycling.